09/00817/FULL
|
Various works in connection with reservoir safety improvements:- 1. Construction of new spillway to River Hull. 2. Raising of reservoir embankments using sheet piling to 6.05m (19'10") (Above ordnance Datum (AOD) [from approximately 4.2m; 13'9"] (AOD). 3. Enclosure of site by 2m (6'6") high wire fencing. (Revised resubmission including hedge screening).
|
Bransholme Lagoon Selset Way Waterside Park Kingston Upon Hull