09/00817/FULL
|
Various works in connection with reservoir safety improvements:- 1. Construction of new spillway to River Hull. 2. Raising of reservoir embankments using sheet piling to 6.05m (19'10") (Above ordnance Datum (AOD) [from approximately 4.2m; 13'9"] (AOD). 3. Enclosure of site by 2m (6'6") high wire fencing. (Revised resubmission including hedge screening).
|
Bransholme Lagoon Selset Way Waterside Park Kingston Upon Hull
Report Confirmation
- You are about to report this comment to the Local Authority as potentially controversial or defamatory.
- Your contact details will be supplied to the Local Authority as part of the comment reporting process.
Do you want to proceed with this action?
Collapse All|Expand All
(Neutral)
Comment submitted date: Thu 29 Oct 2009
The plan is not clearas to where the footpath is. The diagram shows the way being raised, which we have no objection to provided it is safe, and it is not narrowed.