26/00890/FULL
|
Proposed phased replacement of the existing concrete footbridge, comprising: Phase 1: Demolition of the existing concrete footbridge. Phase 2: Erection of a new steel footbridge with stepped access only. Phase 3: Installation of accessible ramps to serve the new footbridge.
|
Footbridge Over Railway At Priory Drive Kingston Upon Hull
Received
Thu 17 Sep 2026
Validated
Mon 21 Sep 2026
Consultation
Thu 22 Oct 2026
Recommendation and/or Committee
Decided
- Details
- Comments
- Constraints
- Documents (0)
- Related Cases (1)
This map is reproduced from Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of Her Majesty's Stationery Office Crown copyright. Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings. COUNCIL NAME, Licence No. LICENCE NUMBER (2022).

