Planning – Planning Application Documents

Help with this page (opens in a new window)

22/00207/NMA | Non material amendment for 21/00187/RES - Erection of a factory building (288m long x 110m wide x 21.6m high max), a further factory building (138m long x 68m wide x 21m high max), and an office building with external stair (26.5m long x 12.1m wide x 5m high max) Submission of reserved matters (appearance, landscaping, layout and scale) under Condition 1 to the Port of Hull Local Development Order May 2017 (17/00173/LDO) | Siemens Gamesa Renewable Energy Limited Alexandra Dock Port Of Hull Kingston Upon Hull HU9 1TA NMA Approved
  • Print summary icon
Received
Mon 21 Feb 2022
Validated
Mon 21 Feb 2022
Consultation
Recommendation and/or Committee
Decided
Wed 27 Apr 2022

You can select up to 25 documents to download in one archive file at a time.

Date Published Document Type Description View
11 Jul 2023 Correspondence NMA LETTER 27/04/2022 View document icon
21 Feb 2022 Application Form SIEMENS, ALEXANDRA DOCK View document icon
21 Feb 2022 Drawing GA_ELEVATIONS-S4-P7 View document icon
21 Feb 2022 Drawing GA_ROOF_PLAN-S4-P6 View document icon
21 Feb 2022 Drawing GA_GROUND_FLOOR_PLAN-S4-P7 View document icon
21 Feb 2022 Drawing PROPOSED_SITE_ELEVATIONS-S4-P7 View document icon
21 Feb 2022 BackGround Papers FEE CALCULATION AND ATTACHMENT SUMMARY View document icon
21 Feb 2022 BackGround Papers FEE CALCULATION AND ATTACHMENT SUMMARY View document icon
21 Feb 2022 Drawing -PROPOSED_SITE_SECTION-S4-P5 View document icon
21 Feb 2022 Drawing PROPOSED_PHASE_NORTH_WEST_3D_VIEW-S4-P7 View document icon
21 Feb 2022 Drawing -PROPOSED_SITE_PLAN-S4-P7 View document icon
21 Feb 2022 Drawing OVERALL_GROUND_FLOOR_PLAN-S4-P9 View document icon
21 Feb 2022 Drawing GA_ELEVATIONS_E_&_W-S4-P6 View document icon
21 Feb 2022 Drawing SEG_2-7_GA_ELEVATIONS_N_&_S-S4-P7 View document icon
21 Feb 2022 Drawing SEG_2-7_OVERALL_ROOF_PLAN-S4-P6 View document icon
21 Feb 2022 Drawing SEG_2-7_OVERALL_GROUND_FLOOR_PLAN-S4-P8 View document icon
21 Feb 2022 Report VFL TECHNICAL NOTE - PCP REPLACEMENT - 24.08.2021 View document icon

Powered by Idox